Logo do repositório
Comunidades & Coleções
Tudo no DSpace
Ficha Catalográfica
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Entrar
Novo usuário? Clique aqui para cadastrar.Esqueceu sua senha?
  1. Início
  2. Pesquisar por Autor

Navegando por Autor "Almeida, Marcos Ramon Lima"

Filtrar resultados informando as primeiras letras
Agora exibindo 1 - 1 de 1
  • Resultados por Página
  • Opções de Ordenação
  • Imagem de Miniatura
    Item
    Diretrizes para construção de caixas para instalação de elevadores elétricos de passageiros
    (2016-12-07) Almeida, Marcos Ramon Lima; Chagas, Sidney Assis; http://lattes.cnpq.br/1705258854443084; Chagas, Sidney Assis; http://lattes.cnpq.br/1705258854443084; Monteiro, Alberto de Castro; http://lattes.cnpq.br/8300386519703896; Machado, Carlos José Baptista; http://lattes.cnpq.br/2613703649034215
    Elevators are an essential equipment for the operation of almost all developments, such as large commercial and residential buildings, hotels, malls and hospitals. In cases where elevators do not work properly or stop frequently, the success of this ploy can be seriously compromised due to users' fear of getting stuck in the equipment. The present work show the guidelines for the construction of the elevator boxes to minimize or exclude mistakes in the construction stage, which end up harming and even unfeasible the services of installation, bringing expenses and inconvenience for who was hired (works) as well as for the Contractors (manufacturers of lifts). These guidelines will provide for those responsible for the execution of the boxes the information needed to understand the process and procedures to avoid the construction problems that are primarily responsible for the problems faced by the assembly that end up impacting the final delivery of the lift. The data were obtained through surveys, interviews and observation in Manaus works in the most different stages, both pre-installation, assembly and technical assistance. In this way it was possible to confirm the difficulties encountered and how the pre-install the processes impact on the assembly services and the final delivery of the equipment. It has been realized by an orientation of the whole process in the integration and follow-up through a detailed schedule of activities by the contractor and the contractor can minimize many problems and unnecessary expenses of time and money in this process for both involved.
Instituto Federal de Educação, Ciência e Tecnologia do Estado do Amazonas
Coordenação geral de bibliotecas - cgeb.proen@ifam.edu.br
Diretoria de Gestão de tecnologia da informação - dgti@ifam.edu.br