Logo do repositório
Comunidades & Coleções
Tudo no DSpace
Ficha Catalográfica
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Entrar
Novo usuário? Clique aqui para cadastrar.Esqueceu sua senha?
  1. Início
  2. Pesquisar por Autor

Navegando por Autor "Gomes, Felipe Menezes"

Filtrar resultados informando as primeiras letras
Agora exibindo 1 - 1 de 1
  • Resultados por Página
  • Opções de Ordenação
  • Imagem de Miniatura
    Item
    Plano de manutenção preventiva para uma parafusadeira em uma empresa do Pólo Industrial de Manaus
    (2020-10-01) Gomes, Felipe Menezes; Costa, José Francisco de Caldas; http://lattes.cnpq.br/5703032306296974; Costa, José Francisco de Caldas; http://lattes.cnpq.br/5703032306296974; Castro, Cristovão Américo Ferreira de; http://lattes.cnpq.br/4930257608461492; Chagas, Sidney Assis; http://lattes.cnpq.br/1705258854443084
    In the company of industrial pole in Manaus, Beta Ltda (fictitious name) made a study on the failure modes in a screwdriver in the electronic sector in order to diagnose problems related to corrective maintenance and maintenance time. And the objective is to compare a corrective maintenance program (current) with the preventive maintenance plan (ideal). The methodology used was divided into four stages, such as what are the study or case factors, with probability of failure, development of a cycle counter device and finally, or a preventive maintenance plan. As the results were given frequency of failure and the most recurrent failure modes, as well as a probability of failure was identified, the ideal period for preventive maintenance, or the number of pre-failure operation cycles and the preventive maintenance plan used previous results. As final considerations elucidated that were verified without correspondence with the results found for probability of real failure, the cycle counter device is accused of approximately 20º. the day of each month is necessary to carry out preventive maintenance and, finally, the implementation of the preventive maintenance model saves more than 300 min / month of maintenance time.
Instituto Federal de Educação, Ciência e Tecnologia do Estado do Amazonas
Coordenação geral de bibliotecas - cgeb.proen@ifam.edu.br
Diretoria de Gestão de tecnologia da informação - dgti@ifam.edu.br